Narrative Description of Project:
The project is aimed at resettling the residents of Atuabo/Akontansi at New Atuabo within the planned mine development area of the Tarkwa Gold Mine. Due to the volume of the project, it was packaged into separate contracts as follows:
i. Contract 1: Erosion Control Grassing
- This component of the project consisted of the grassing of embankments of area 3905mē.
- Ii. Contract 2: Box Culverts
- The works under this contract consisted of the construction of 4No. Box Culvert to channel out water from the prepared land.
-
|