|
Narrative Description of Project:
Project involved a feasibility study, design and construction of a weir on caisson foundations and the construction of a Pilot Irrigation Scheme for rice and maize over an area of 20 ha. The cost of the project was US$0.45million and was financed by Wienco Ghana Ltd.
|
|
|
Description of Actual Services Provided by ABP:
Complete engineering services provided included detailed topographical survey, hydrological studies and design of the weir structure, preparation of contact documents, supervision of construction and contract management of the Pilot Irrigation scheme.
|
|